Price request

Online shop UVMILK

Visit our new website
Installation scheme

Installation scheme

1 Open the cover
2 Insert the filter cartridge
into the cover of the
filter housing.
3 Locate the filter
cartridge in the
filter housing.
4 Fix the cover
of the filter housing
by clamps

UVMILK filter shoud be installed after the pump

It is recommended to сconnect a cooler after the filter

Don’t heat the filter to the temperature above 130 °C and don’t freeze it

Don’t flow orthophosphoric and boracic acids through the filter

Types of connection:

There are three main types of connection for dairy equipment.

Clamp connection
1½ ”
(38 mm)
2 ”
(50 mm)
Hose connection
1 ”
(25 mm)
1¼ ”
(32 mm)
1½ ”
(38 mm)
2 ”
(50 mm)
DIN,SMS connection
1 ”
(25 mm)
1¼ ”
(32 mm)
1½ ”
(38 mm)
2 ”
(50 mm)

Dimensions

Mini
capacity up to 2 tons
Price request
Small
capacity up to 7 tons
Price request
Medium
capacity up to 15 tons
Price request
Large
capacity up to 30 tons
Price request
Master
capacity up to 50 tons
Price request
Expert
capacity up to 100 tons
Price request

Download presentation


Protection from automated form filling   Please type in the symbols shown in the image above*